The fastest residential broadband available in TF13 6AD is Superfast Broadband, which is available to all residential premises, delivering an average download speed of 62 Mbps. No residential premises in TF13 6AD have either Full Fibre Broadband or Ultrafast Broadband availability. All residential premises in TF13 6AD have Standard Broadband availability.
Ofcom Broadband CheckerOfcom release coverage data collected as a snapshot in May 2020 for Standard Broadband connections in TF13 6AD.
Compare May 2020 Standard Broadband coverage in TF13 6AD to the wider area:
TF13 6AD Standard Broadband coverage | |
Area | Coverage |
---|---|
TF13 6AD Postcode | 100.0% |
SHROPSHIRE Local authority, 142,540 premises | 96.2% |
Ludlow Parliamentary constituency, 39,013 premises | 93.0% |
Ofcom release coverage data collected as a snapshot in May 2020 for Superfast Broadband connections in TF13 6AD.
Compare May 2020 Superfast Broadband coverage in TF13 6AD to the wider area:
TF13 6AD Superfast Broadband coverage | |
Area | Coverage |
---|---|
TF13 6AD Postcode | 100.0% |
SHROPSHIRE Local authority, 142,540 premises | 87.1% |
Ludlow Parliamentary constituency, 39,013 premises | 80.2% |
Ofcom release performance data collected as a snapshot in May 2019 for Superfast Broadband connections in TF13 6AD.
Compare the May 2019 Superfast Broadband average download speed in TF13 6AD to the wider area:
TF13 6AD Superfast Broadband average download speed | |
Area | Speed |
---|---|
TF13 6AD Postcode | 62.4 Mbps |
Shropshire Local authority | 58.5 Mbps |
Ludlow Parliamentary constituency | 55.5 Mbps |
Ofcom release coverage data collected as a snapshot in May 2020 for Ultrafast Broadband connections in TF13 6AD.
Compare May 2020 Ultrafast Broadband coverage in TF13 6AD to the wider area:
TF13 6AD Ultrafast Broadband coverage | |
Area | Coverage |
---|---|
TF13 6AD Postcode | 0.0% |
SHROPSHIRE Local authority, 142,540 premises | 13.0% |
Ludlow Parliamentary constituency, 39,013 premises | 4.8% |
Ofcom release coverage data collected as a snapshot in May 2020 for Full Fibre Broadband connections in TF13 6AD.
Compare May 2020 Full Fibre Broadband coverage in TF13 6AD to the wider area:
TF13 6AD Full Fibre Broadband coverage | |
Area | Coverage |
---|---|
TF13 6AD Postcode | 0.0% |
SHROPSHIRE Local authority, 142,540 premises | 5.3% |
Ludlow Parliamentary constituency, 39,013 premises | 4.8% |