The fastest residential broadband available in SR8 3DP is Ultrafast Broadband, which is available to 7% of residential premises, delivering a minimum download speed of 300 Mbps. No residential premises in SR8 3DP have Full Fibre Broadband availability. All residential premises in SR8 3DP have Superfast Broadband and Standard Broadband availability.
Ofcom Broadband CheckerOfcom release coverage data collected as a snapshot in May 2020 for Standard Broadband connections in SR8 3DP.
Compare May 2020 Standard Broadband coverage in SR8 3DP to the wider area:
SR8 3DP Standard Broadband coverage | |
Area | Coverage |
---|---|
SR8 3DP Postcode | 100.0% |
COUNTY DURHAM Local authority, 244,501 premises | 98.8% |
Easington Parliamentary constituency, 39,167 premises | 100.0% |
Ofcom release coverage data collected as a snapshot in May 2020 for Superfast Broadband connections in SR8 3DP.
Compare May 2020 Superfast Broadband coverage in SR8 3DP to the wider area:
SR8 3DP Superfast Broadband coverage | |
Area | Coverage |
---|---|
SR8 3DP Postcode | 100.0% |
COUNTY DURHAM Local authority, 244,501 premises | 94.0% |
Easington Parliamentary constituency, 39,167 premises | 96.8% |
Ofcom release performance data collected as a snapshot in May 2019 for Superfast Broadband connections in SR8 3DP.
Compare the May 2019 Superfast Broadband average download speed in SR8 3DP to the wider area:
SR8 3DP Superfast Broadband average download speed | |
Area | Speed |
---|---|
SR8 3DP Postcode | 55.5 Mbps |
County Durham Local authority | 54.9 Mbps |
Easington Parliamentary constituency | 54.1 Mbps |
Ofcom release coverage data collected as a snapshot in May 2020 for Ultrafast Broadband connections in SR8 3DP.
Compare May 2020 Ultrafast Broadband coverage in SR8 3DP to the wider area:
SR8 3DP Ultrafast Broadband coverage | |
Area | Coverage |
---|---|
SR8 3DP Postcode | 6.5% |
COUNTY DURHAM Local authority, 244,501 premises | 15.3% |
Easington Parliamentary constituency, 39,167 premises | 19.8% |
Ofcom release coverage data collected as a snapshot in May 2020 for Full Fibre Broadband connections in SR8 3DP.
Compare May 2020 Full Fibre Broadband coverage in SR8 3DP to the wider area:
SR8 3DP Full Fibre Broadband coverage | |
Area | Coverage |
---|---|
SR8 3DP Postcode | 0.0% |
COUNTY DURHAM Local authority, 244,501 premises | 10.4% |
Easington Parliamentary constituency, 39,167 premises | 9.1% |