The fastest residential broadband available in DA8 3BZ is Superfast Broadband, which is available to all residential premises, delivering an average download speed of 59 Mbps. No residential premises in DA8 3BZ have either Full Fibre Broadband or Ultrafast Broadband availability. All residential premises in DA8 3BZ have Standard Broadband availability.
Ofcom Broadband CheckerOfcom release coverage data collected as a snapshot in May 2020 for Standard Broadband connections in DA8 3BZ.
Compare May 2020 Standard Broadband coverage in DA8 3BZ to the wider area:
DA8 3BZ Standard Broadband coverage | |
Area | Coverage |
---|---|
DA8 3BZ Postcode | 100.0% |
BEXLEY Local authority, 98,507 premises | 98.7% |
Erith and Thamesmead Parliamentary constituency, 44,471 premises | 98.7% |
Ofcom release coverage data collected as a snapshot in May 2020 for Superfast Broadband connections in DA8 3BZ.
Compare May 2020 Superfast Broadband coverage in DA8 3BZ to the wider area:
DA8 3BZ Superfast Broadband coverage | |
Area | Coverage |
---|---|
DA8 3BZ Postcode | 100.0% |
BEXLEY Local authority, 98,507 premises | 98.1% |
Erith and Thamesmead Parliamentary constituency, 44,471 premises | 98.7% |
Ofcom release performance data collected as a snapshot in May 2019 for Superfast Broadband connections in DA8 3BZ.
Compare the May 2019 Superfast Broadband average download speed in DA8 3BZ to the wider area:
DA8 3BZ Superfast Broadband average download speed | |
Area | Speed |
---|---|
DA8 3BZ Postcode | 58.7 Mbps |
Bexley Local authority | 93.3 Mbps |
Erith and Thamesmead Parliamentary constituency | 86.5 Mbps |
Ofcom release coverage data collected as a snapshot in May 2020 for Ultrafast Broadband connections in DA8 3BZ.
Compare May 2020 Ultrafast Broadband coverage in DA8 3BZ to the wider area:
DA8 3BZ Ultrafast Broadband coverage | |
Area | Coverage |
---|---|
DA8 3BZ Postcode | 0.0% |
BEXLEY Local authority, 98,507 premises | 76.5% |
Erith and Thamesmead Parliamentary constituency, 44,471 premises | 73.2% |
Ofcom release coverage data collected as a snapshot in May 2020 for Full Fibre Broadband connections in DA8 3BZ.
Compare May 2020 Full Fibre Broadband coverage in DA8 3BZ to the wider area:
DA8 3BZ Full Fibre Broadband coverage | |
Area | Coverage |
---|---|
DA8 3BZ Postcode | 0.0% |
BEXLEY Local authority, 98,507 premises | 17.0% |
Erith and Thamesmead Parliamentary constituency, 44,471 premises | 15.7% |