The fastest residential broadband available in DA7 5NB is Ultrafast Broadband, which is available to all residential premises, delivering a minimum download speed of 300 Mbps. No residential premises in DA7 5NB have Full Fibre Broadband availability. All residential premises in DA7 5NB have Superfast Broadband and Standard Broadband availability.
Ofcom Broadband CheckerOfcom release coverage data collected as a snapshot in May 2020 for Standard Broadband connections in DA7 5NB.
Compare May 2020 Standard Broadband coverage in DA7 5NB to the wider area:
DA7 5NB Standard Broadband coverage | |
Area | Coverage |
---|---|
DA7 5NB Postcode | 100.0% |
BEXLEY Local authority, 98,507 premises | 98.7% |
Erith and Thamesmead Parliamentary constituency, 44,471 premises | 98.7% |
Ofcom release coverage data collected as a snapshot in May 2020 for Superfast Broadband connections in DA7 5NB.
Compare May 2020 Superfast Broadband coverage in DA7 5NB to the wider area:
DA7 5NB Superfast Broadband coverage | |
Area | Coverage |
---|---|
DA7 5NB Postcode | 100.0% |
BEXLEY Local authority, 98,507 premises | 98.1% |
Erith and Thamesmead Parliamentary constituency, 44,471 premises | 98.7% |
Ofcom release performance data collected as a snapshot in May 2019 for Superfast Broadband connections in DA7 5NB.
Compare the May 2019 Superfast Broadband average download speed in DA7 5NB to the wider area:
DA7 5NB Superfast Broadband average download speed | |
Area | Speed |
---|---|
DA7 5NB Postcode | 114.8 Mbps |
Bexley Local authority | 93.3 Mbps |
Erith and Thamesmead Parliamentary constituency | 86.5 Mbps |
Ofcom release coverage data collected as a snapshot in May 2020 for Ultrafast Broadband connections in DA7 5NB.
Compare May 2020 Ultrafast Broadband coverage in DA7 5NB to the wider area:
DA7 5NB Ultrafast Broadband coverage | |
Area | Coverage |
---|---|
DA7 5NB Postcode | 100.0% |
BEXLEY Local authority, 98,507 premises | 76.5% |
Erith and Thamesmead Parliamentary constituency, 44,471 premises | 73.2% |
Ofcom release coverage data collected as a snapshot in May 2020 for Full Fibre Broadband connections in DA7 5NB.
Compare May 2020 Full Fibre Broadband coverage in DA7 5NB to the wider area:
DA7 5NB Full Fibre Broadband coverage | |
Area | Coverage |
---|---|
DA7 5NB Postcode | 0.0% |
BEXLEY Local authority, 98,507 premises | 17.0% |
Erith and Thamesmead Parliamentary constituency, 44,471 premises | 15.7% |